Semitropic Groundwater Banking Project 2018-02-07T18:12:51+00:00

Project Description

Semitropic Groundwater Banking Project

Wasco, California

Design-Builder of Phase 1 $200M Stored Water Recovery Unit project. East-west connection between the California Aqueduct and the District’s Pond-Poso Canal System, allowing the bi-directional conveyance of up to 720cfs of water. Features: 38,000LF of 120″ RCP pipeline, 144″ tunnel crossing of Hwy 5, aqueduct turnout, 12,000HP junction reservoir pumping plant, concrete lined canal, forebay, reservoir spillway with adjustable weir structure, connection channel check structure with reverse flow pumps, electrical, instrumentation, 1.0MW electrical generation facility that utilizes tracking photovoltaic solar panels.

Contract Amount: $46,771,750
Completion Date: 2007
Owner: Semitropic Improvement District.
W.M. Lyles Co. PM: Brad Zeimet