Fresno Southeast Surface Water Treatment Facility 2018-11-05T23:38:53+00:00

Project Description

Fresno Southeast Surface Water Treatment Facility

Fresno Southeast Surface Water Treatment Facility

Fresno Southeast Surface Water Treatment Facility

Northern Division, Water Treatment

Sacramento, CA

The SESWTF is designed to treat 80 MDG of surface (river) water from the Kings River to provide potable water to City residents. This
greenfield project includes the following processes; flow control structure, pre-treatment basins (flocculation/sedimentation with plate settlers),
ozone disinfection structure, and filters (GAC gravity filter). The facility also includes an 8MG treated water reservoir, chemical building, treated
water and backwash pump station; washwater recovery and solids lagoons and associated pump stations, electrical substation, operations
building, maintenance building, all site utilities (with pipelines up to 84”), landscaping and pavement throughout the site. We also provide a perimeter block wall and offsite road utilities, reconstruction and improvements.

Contract Amount: $159,892,615

Anticipated Completion Date: September, 2018