Project Description

Fairfield-Suisun Sewer District Slide Gate Replacement Project

Northern Division, Wastewater Treatment

Fairfield, CA

Work generally consisted of furnishing and installing four new Type 316L stainless steel heavy duty slide gates to replace existing aluminum slide gates, which were experiencing severe galvanic corrosion.

In addition, removal of an existing slide gate was required.

Amount: $87,500.00

Completion Date: September 2014