California American Water Prior & West La Loma Well Site Improvements 2018-02-07T18:12:48+00:00

Project Description

California American Water Prior & West La Loma Well Site Improvements

California American Water Prior & West La Loma Well Site Improvements

Northern Division, Water Treatment

Sacramento, CA

Prior Well Site Location work consisted of:

  • Removal and replacement of electrical and SCADA panels with new control panel
  • Modification of piping to accept new flowmeter
  • Installation of (owner furnished) analyzer and pressure panels
  • Provided new ductbank, wired and piped as necessary to relocate equipment and control panel
  • Activated irrigation system
  • Provided ground cover on sloped perimeter of well site
  • Replaced doors and fan at well pump building, and slurry sealed pavement.

West La Loma Location work consisted of:

  • Demolished pump building, electrical and SCADA panels, and pavement
  • Provided new control panel, new pump discharge, waste piping and flowmeter
  • Installation of (owner furnished) flow and pressure panels
  • Relocated SCADA antenna, chemical tank and eyewash
  • Modification/repair of fencing
  • Installed new chemical shack and sound enclosure
  • Provided new ductbank, wired and piped as necessary to relocated equipment and control panel
  • Re-paved and re-finished concrete for entire site

Amount: $153,891.50

Completion Date: September 2013